Power station refurbishment - opportunities for coal, IEACR/42
Author(s): David H Scott
Price: £60.00
Ref: IEACR/42 |
No. of Tables: 12 |
This report is concerned with opportunities for coal in power station projects aimed at upgrading and refurbishment of existing sites. Where advantage can be taken of the fact that there is an existing licence for power generation. The report relates some of the problems which utilities have encountered in the planning and execution of such projects and makes comparisons with new site options. Whereas planning and construction of a utility power station on a new site, including necessary licensing procedures, appears to involve a lead time of about 10 years from first inception, upgrading offers the prospects of shorter routes to increased generating capacity, with less risk and lower capital investment. Early attempts to implement particular schemes revealed drawbacks to this approach both in terms of site constraints and, in some cases, unforseen modifications to licensing requirements. The report includes examples of successful plant upgrades including the use of `clean coal technology' to overcome such constraints and facilitate staged commitment of capital in relatively small independently justifiable projects.
Customers who bought this report also bought...
Modelling and simulation for coal gasification, CCC/42
CCC/42 - ISBN: 92-9029-354-3Following a previous report on Coal combustion modelling, this short report covers the recent development in coal gasification modelling and simulation, which is a relatively new field. Mathematical modelling is increasingly ... More...
Price: £60.00
Advanced clean coal technologies and low value coals, CCC/39
CCC/39 - ISBN: 92-9029-351-9This study investigates the application of low value coals to advanced clean coal technologies, namely Integrated Gasification Combined Cycle (IGCC), Circulating Fluidised Bed Combustion (CFBC), Pressurised Fluidised Bed Comb... More...
Price: £60.00
Prospects for upgrading coal-fired power plants, CCC/41
CCC/41 - ISBN: 92-9029-353-5Upgrading ageing power plants can be a cost-effective option for extending their residual life, increasing capacity, efficiency and performance, reducing operating and maintenance costs, enhancing reliability and availability... More...
Price: £60.00
Ageing of coal-fired power plants, CCC/45
CCC/45 - ISBN: 92-9029-357-8In most cases coal-fired power plant can have its life extended by a factor of 50-100% over the original design life. This arises in part from the conservative assumptions made in the original design process and in part is a ... More...
Price: £60.00
How coal properties influence emissions, CCC/28
CCC/28 - ISBN: 92-9029-338-1This report examines the influence of coal properties on the emission of pollutants to the atmosphere. To illustrate this, four pollutants are considered. They are: sulphur oxides, nitrogen oxides, particulates, and trace ele... More...
Price: £60.00